Collaborative risk mitigation through construction planning and scheduling : risk doesn't have to be a four-letter word / by Lana Kay Coble, ED.D, CPC (Tellepsen Builders, USA).
Material type:
TextPublisher: Emerald Publishing Limited, Description: 1 online resource (xix, 152 pages) : illustrationsISBN: 9781787431478 (e-book)Subject(s): Construction industry -- Risk management | Production scheduling | Strategic planning | Technology & Engineering, Construction -- General | Civil engineering, surveying & buildingAdditional physical formats: No titleDDC classification: 624.068 LOC classification: HD9715.A2 | C63 2018Online resources: Click here to access online | Item type | Current library | Call number | URL | Status | Date due | Barcode | Item holds |
|---|---|---|---|---|---|---|---|
eBook
|
Digital Library
Resources in this library are accessible in digital format e.g. eBooks or eJournals accessible online. |
HD9715.A2 C63 2018 (Browse shelf(Opens below)) | Link to resource | Available |
Browsing Digital Library shelves, Shelving location: Online Access Close shelf browser (Hides shelf browser)
|
|
|
|
|
|
|
||
| HD9710.U52 J64 1984 The American and Japanese Auto Industries in Transition | HD9710.3.U52 K55 2008 Who Really Made Your Car? | HD9715.A2 A15 2019 10th Nordic conference on construction economics and organization / | HD9715.A2 C63 2018 Collaborative risk mitigation through construction planning and scheduling : | HD9718.A2 T737 2009 Transport, welfare and externalities | HD9864.N44 M563 1993 La protoindustria colonial hispanoamericana | HD9929.2.M62 M47 Estructura y dinamismo del mercado de tecnología industrial en México |
Includes bibliographical references and index.
Prelims -- Introduction -- Has it ever gone as planned? -- Who benefits from planning and how? -- Real construction mitigation case studies -- Risk management matrix -- Communicating the project schedule and change management -- Contingency planning -- Implementing mitigation measures through technological application of the computer scheduling software -- Did your planning meet the desired deadline? -- Appendix -- Definitions -- References -- List of figures & tables -- Index.
In the complex, cash-strapped, high pressure world of modern construction, what do you do when something goes wrong? This work looks beyond the best-case scenario to give project managers, contractors, architects and engineers the tools to prepare effectively for the unexpected. Based on the author's more than thirty-five years of construction management experience, the book shows how to proactively mitigate a schedule. It opens with case studies of real life construction mitigation, and goes on to examine the conceptual aspects of anticipating risks and making contingency plans, technical aspects of scheduling, and essential role of communication in change management.Working on the principle that no major project can ever quite go to plan and that "it's not how you start, it's how you finish," Collaborative Risk Mitigation is the ideal complement to traditional scheduling textbooks.